Nongling
Download PDF data sheet
Nongling completed

Particulars
Owner: Dehong Longjiang Hydropower Development Co. Ltd.
Designer: Shanghai Institute of Investigation and Design of Water Conservancy and Hydropower, MOE & MWR
Contractor: SinoHydro Construction Bureau Nº3 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 233 m3x106
Height: 91 metres
Length: 280 metres
Volume of RCC: unknown
Total volume: 486 m3x103
Construction Dates
Start of Project: —/06 (— 2006)
Start of RCC: —/07 (— 2007)
End of RCC: —/08 (— 2008)
End of Project: —/09 (— 2009)
Country: China
River: Long
DMS Co-ordinates: 24˚35'17.19"N, 98˚20'41.30"E
DD Co-ordinates: 24.588108, 98.344803
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
