Oued Lakhdar
Download PDF data sheet
Photo coming soon

Particulars
Owner: Direction des Aménagements Hydrauliques
Designer: CID
Contractor: STAM (Société des travaux agricoles du Maroc)
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 150 m3x106
Height: 110 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/23 (— 2023)
Start of RCC: —/25 (— 2025)
End of RCC: —/27 (— 2027)
End of Project: —/27 (— 2027)
Country: Morocco
River: Lakhdar
DMS Co-ordinates: 31˚49'29.16"N, 6˚59'19.2"W
DD Co-ordinates: 31.824766, -6.988667