Passo do Meio
Download PDF data sheet
Passo do Meio completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 27 m3x106
Height: 31 metres
Length: 110 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/00 (— 2000)
Start of RCC: —/01 (— 2001)
End of RCC: —/02 (— 2002)
End of Project: 10/03 (October 2003)
Country: Brazil
River: das Antas
DMS Co-ordinates: 28˚48'23.39"S, 50˚36'47.19"W
DD Co-ordinates: -28.806498, -50.61311
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
