Patuca 3

< Back to search results

Download PDF data sheet
Patuca 3 completed
Patuca 3 completed

Particulars

Owner: ENEE (Empresa Nacional de Energia Eléctrica)

Designer: Power China

Contractor: SinoHydro Co. Ltd. (11th Construction Bureau)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 208 m3x106

Height: 54 metres

Length: 160 metres

Volume of RCC: 120 m3x103

Total volume: 160 m3x103

Construction Dates

Start of Project: /12 ( 2012)

Start of RCC: /16 ( 2016)

End of RCC: 02/17 (February 2017)

End of Project: 12/20 (December 2020)

Country: Honduras

River: Patuca

DMS Co-ordinates: 14˚26'39.71"N, 85˚57'57.24"W

DD Co-ordinates: 14.444364, -85.965897

Facings

Upstream

SlopeType
0.20Traditional concrete against formwork

Downstream

SlopeType
0.75Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
107
Pozzolan (kg/m3)Pozzolan Type
57Natural pozzolan (ASTM Class N)