Particulars

Owner: Darenhes A.S.

Designer: Su Yapi Engineering and Consulting Inc.

Contractor: Akpinds Construction

Statistics

Type: Hardfill

Purpose(s): Hydropower

Reservoir capacity: 358 m3x106

Height: 88 metres

Length: 500 metres

Volume of RCC: 760 m3x103

Total volume: 838 m3x103

Construction Dates

Start of Project: 11/10 (November 2010)

Start of RCC: 03/13 (March 2013)

End of RCC: 10/14 (October 2014)

End of Project: /15 ( 2015)

Country: Turkey

River: PeriSuyu

DMS Co-ordinates: 39˚5'6.33"N, 39˚53'39.13"E

DD Co-ordinates: 39.085091, 39.894203

Facings

Upstream

SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]

Downstream

SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used