SEARCHING
... please wait

Puhulpola (part of Uma Oya Project)

< Back to search results

Download PDF data sheet
Puhulpola (part of Uma Oya Project) under construction
Puhulpola (part of Uma Oya Project) under construction

Particulars

Owner: Ministry of Irrigation and Water Resources Management

Designer: unknown

Contractor: Farab Company, Iran (sub-Contracted to Ev-Yol Construction Co.)

Statistics

Type: Gravity

Purpose(s): Hydropower / Irrigation

Reservoir capacity: 1 m3x106

Height: 35 metres

Length: 174 metres

Volume of RCC: 30 m3x103

Total volume: 40 m3x103

Construction Dates

Start of Project: /11 ( 2011)

Start of RCC: /13 ( 2013)

End of RCC: /18 ( 2018)

End of Project: /19 ( 2019)

Country: Sri Lanka

River: Dulgolla Oya

DMS Co-ordinates: 6˚54'50.7"N, 80˚56'0.50"E

DD Co-ordinates: 6.914083, 80.933472

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
 Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)