Rondinha
Download PDF data sheet
Rondinha completed

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 20 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/12 (— 2012)
End of RCC: —/14 (— 2014)
End of Project: —/14 (— 2014)
Country: Brazil
River: Chapecó
DMS Co-ordinates: 26˚40'56.16"S, 52˚2'42.99"W
DD Co-ordinates: -26.682266, -52.045277
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
