Santo Antonio-RO
Download PDF data sheet
Santo Antonio-RO completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 2075 m3x106
Height: 25 metres
Length: 3100 metres
Volume of RCC: 560 m3x103
Total volume: 3086 m3x103
Construction Dates
Start of Project: —/08 (— 2008)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: 03/12 (March 2012)
Country: Brazil
River: Madeira
DMS Co-ordinates: 8˚47'48.13"S, 63˚57'7.94"W
DD Co-ordinates: -8.796703, -63.952206
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
