Sefaköy

Download PDF data sheet
Sefaköy completed
Sefaköy completed

Particulars

Owner: Püre Energy Üretim Tic. A.S.

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 15 m3x106

Height: 45 metres

Length: 148 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /08 ( 2008)

Start of RCC: /10 ( 2010)

End of RCC: /11 ( 2011)

End of Project: 10/11 (October 2011)

Country: Turkey

River: Aras

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
 RCC against formwork

Downstream

SlopeType
 RCC against formwork