Serra dos Cavalinhos I
Download PDF data sheet
Photo coming soon

Statistics
Type: unknown
Purpose(s): Hydropower
Reservoir capacity: 12 m3x106
Height: 30 metres
Length: 204 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/13 (— 2013)
Start of RCC: —/15 (— 2015)
End of RCC: —/16 (— 2016)
End of Project: —/17 (— 2017)
Country: Brazil
River: das Antas
DMS Co-ordinates: 28˚47'46.02"S, 50˚43'48.75"W
DD Co-ordinates: -28.796118, -50.730209
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
