Shin Maruyama
Download PDF data sheet
Photo coming soon

Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower
Reservoir capacity: 131 m3x106
Height: 118 metres
Length: 341 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/22 (— 2022)
Start of RCC: —/25 (— 2025)
End of RCC: —/28 (— 2028)
End of Project: —/30 (— 2030)
Country: Japan
River: Kiso
DMS Co-ordinates: 35˚28'8.31"N, 137˚10'19.64"E
DD Co-ordinates: 35.468975, 137.172119
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
