Shuhe
Download PDF data sheet
Shuhe completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 176 m3x106
Height: 72 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/06 (— 2006)
Start of RCC: —/07 (— 2007)
End of RCC: —/08 (— 2008)
End of Project: —/09 (— 2009)
Country: China
River: Hanjiang
DMS Co-ordinates: 32˚55'35.42"N, 109˚41'55.02"E
DD Co-ordinates: 32.926506, 109.698616
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
