Singrobo-Ahouaty
Download PDF data sheet
Singrobo-Ahouaty completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 105 m3x106
Height: 24 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 10/19 (October 2019)
Start of RCC: —/21 (— 2021)
End of RCC: —/22 (— 2022)
End of Project: 03/23 (March 2023)
Country: Ivory Coast
River: Bandama
DMS Co-ordinates: 06˚06'10.15"N, 04˚57'07.99"W
DD Co-ordinates: 6.102819, -4.952219
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
