Toca do Tigre
Download PDF data sheet
Toca do Tigre completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 6 m3x106
Height: 22 metres
Length: 237 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/11 (— 2011)
End of RCC: —/12 (— 2012)
End of Project: —/13 (— 2013)
Country: Brazil
River: Turvo
DMS Co-ordinates: 27˚32'40.88"S, 53˚48'24.49"W
DD Co-ordinates: -27.544687, -53.806805
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
