Tongzilin
Download PDF data sheet
Tongzilin completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1 m3x106
Height: 71 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/08 (— 2008)
Start of RCC: —/10 (— 2010)
End of RCC: —/14 (— 2014)
End of Project: —/16 (— 2016)
Country: China
River: Yalong
DMS Co-ordinates: 26˚42'28.13"N, 101˚50'58.31"E
DD Co-ordinates: 26.707813, 101.849533
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
