SEARCHING
... please wait

Upper Yeywa (Kyaukme)

< Back to search results

Download PDF data sheet
Upper Yeywa (Kyaukme) under construction
Upper Yeywa (Kyaukme) under construction

Particulars

Owner: Department of Hydroelectric Power - Ministry of Electric Power

Designer: Lahmeyer/Stucky - AFRY

Contractor: DHPI

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 341 m3x106

Height: 102 metres

Length: 266 metres

Volume of RCC: 532 m3x103

Total volume: 580 m3x103

Construction Dates

Start of Project: /15 ( 2015)

Start of RCC: /24 ( 2024)

End of RCC: /28 ( 2028)

End of Project: /29 ( 2029)

Country: Myanmar

River: Myitnge

DMS Co-ordinates: 22˚14'31.57"N, 97˚06'6.84"E

DD Co-ordinates: 22.242104, 97.101898

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type