Xiangjiaba

Download PDF data sheet
Xiangjiaba completed
Xiangjiaba completed

Particulars

Owner: China Three Gorges Corporation

Designer: Hydrochina Zhongnan Engineering Corporation

Contractor: SinoHydro Construction Bureaux Nº3, Nº4, Nº5, Nº7 and Nº8 Co. Ltd.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 52 m3x106

Height: 162 metres

Length: 909 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /06 ( 2006)

Start of RCC: /10 ( 2010)

End of RCC: /14 ( 2014)

End of Project: /16 ( 2016)

Country: China

River: Jinsha

DMS Co-ordinates: 28˚38'35.42"N, 104˚23'31.85"E

DD Co-ordinates: 28.643171, 104.392181