Xiangjiaba
Download PDF data sheet
Xiangjiaba completed

Particulars
Owner: China Three Gorges Corporation
Designer: Hydrochina Zhongnan Engineering Corporation
Contractor: SinoHydro Construction Bureaux Nº3, Nº4, Nº5, Nº7 and Nº8 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 52 m3x106
Height: 162 metres
Length: 909 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/06 (— 2006)
Start of RCC: —/10 (— 2010)
End of RCC: —/14 (— 2014)
End of Project: —/16 (— 2016)
Country: China
River: Jinsha
DMS Co-ordinates: 28˚38'35.42"N, 104˚23'31.85"E
DD Co-ordinates: 28.643171, 104.392181