SEARCHING
... please wait

Beyyurdu

Download PDF data sheet
Beyyurdu under construction
Beyyurdu under construction

Particulars

Owner: DSI - State Hydraulic Works

Designer: Su Yapi Engineering and Consulting Inc.

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 8 m3x106

Height: 54 metres

Length: 176 metres

Volume of RCC: 186 m3x103

Total volume: 209 m3x103

Construction Dates

Start of Project: 09/08 (September 2008)

Start of RCC: /13 ( 2013)

End of RCC: /14 ( 2014)

End of Project: /15 ( 2015)

Country: Turkey

River: Bembo

DMS Co-ordinates: 37˚18'56"N, 44˚26'58"E

DD Co-ordinates: 37.315556, 44.449444

Facings

Upstream

SlopeType
0.10RCC against formwork

Downstream

SlopeType
0.80RCC against formwork

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -