SEARCHING
... please wait

Çermikler

< Back to search results

Download PDF data sheet
Photo coming soon

Particulars

Owner: DSI - State Hydraulic Works

Designer: NFB Engineering and Consultancy Inc.

Contractor: unknown

Statistics

Type: Hardfill

Purpose(s): Hydropower

Reservoir capacity: 41 m3x106

Height: 42 metres

Length: 251 metres

Volume of RCC: 160 m3x103

Total volume: unknown

Construction Dates

Start of Project: /08 ( 2008)

Start of RCC: /11 ( 2011)

End of RCC: /12 ( 2012)

End of Project: /13 ( 2013)

Country: Turkey

River: Kizilirmak

DMS Co-ordinates: 39˚24'2.07"N, 36˚16'47.33"E

DD Co-ordinates: 39.400574, 36.279812

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type