SEARCHING
... please wait

Dyraaba (part of Uma Oya Project)

< Back to search results

Download PDF data sheet
Dyraaba (part of Uma Oya Project) completed
Dyraaba (part of Uma Oya Project) completed

Particulars

Owner: Ministry of Irrigation and Water Resources Management

Designer: unknown

Contractor: Farab Company, Iran (sub-Contracted to Ev-Yol Construction Co.)

Statistics

Type: Gravity

Purpose(s): Hydropower / Irrigation

Reservoir capacity: 1 m3x106

Height: 50 metres

Length: 165 metres

Volume of RCC: 40 m3x103

Total volume: 50 m3x103

Construction Dates

Start of Project: /11 ( 2011)

Start of RCC: /13 ( 2013)

End of RCC: /17 ( 2017)

End of Project: /18 ( 2018)

Country: Sri Lanka

River: Mathatilla Oya

DMS Co-ordinates: 6˚53'12.98"N, 80˚57'22.73"E

DD Co-ordinates: 6.886939, 80.956314

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
 Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)