SEARCHING
... please wait

La Trong

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 76 metres

Length: unknown

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: 01/90 (January 1990)

Start of RCC: 03/90 (March 1990)

End of RCC: 04/90 (April 1990)

End of Project: 05/90 (May 1990)

Country: Vietnam

River: Song Gianh

DMS Co-ordinates: 17˚52'11.4"N, 105˚47'34.2"E

DD Co-ordinates: 17.869833, 105.792831

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork with external geomembrane

Downstream

SlopeType
0.80Unformed face of RCC

Spillway

SlopeType
0.80Unformed face of RCC

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 No pozzolan used