La Trong
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 76 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 01/90 (January 1990)
Start of RCC: 03/90 (March 1990)
End of RCC: 04/90 (April 1990)
End of Project: 05/90 (May 1990)
Country: Vietnam
River: Song Gianh
DMS Co-ordinates: 17˚52'11.4"N, 105˚47'34.2"E
DD Co-ordinates: 17.869833, 105.792831
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| No pozzolan used | |
