SEARCHING
... please wait

Laúca

Download PDF data sheet
Laúca completed
Laúca completed

Particulars

Owner: Ministry of Energy and Water/GAMEK

Designer: Intertechne

Contractor: Construtora Norberto Odebrecht

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 5482 m3x106

Height: 132 metres

Length: 1075 metres

Volume of RCC: 2646 m3x103

Total volume: 2766 m3x103

Construction Dates

Start of Project: 07/12 (July 2012)

Start of RCC: 09/14 (September 2014)

End of RCC: 03/17 (March 2017)

End of Project: 06/18 (June 2018)

Country: Angola

River: Kwanza

DMS Co-ordinates: 9˚44'33.17"S, 15˚07'34.55"E

DD Co-ordinates: -9.742547, 15.125842

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork
0.10 

Downstream

SlopeType
0.85Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used