SEARCHING
... please wait

Los Pilares (Bicentennial)

Download PDF data sheet
Los Pilares (Bicentennial) under construction
Los Pilares (Bicentennial) under construction

Particulars

Owner: CNA (Comisión Nacional del Agua)

Designer: unknown

Contractor: Canoras-Construplan

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

Reservoir capacity: 478 m3x106

Height: 73 metres

Length: 232 metres

Volume of RCC: 600 m3x103

Total volume: unknown

Construction Dates

Start of Project: 02/14 (February 2014)

Start of RCC: /16 ( 2016)

End of RCC: /19 ( 2019)

End of Project: 08/20 (August 2020)

Country: Mexico

River: Mayo

DMS Co-ordinates: 27˚25'15.1"N, 108˚51'38.35"W

DD Co-ordinates: 27.42086, -108.860657

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type