Los Pilares (Bicentennial)
Download PDF data sheet
Los Pilares (Bicentennial) under construction

Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 478 m3x106
Height: 73 metres
Length: 232 metres
Volume of RCC: 600 m3x103
Total volume: unknown
Construction Dates
Start of Project: 02/14 (February 2014)
Start of RCC: —/16 (— 2016)
End of RCC: —/19 (— 2019)
End of Project: 08/20 (August 2020)
Country: Mexico
River: Mayo
DMS Co-ordinates: 27˚25'15.1"N, 108˚51'38.35"W
DD Co-ordinates: 27.42086, -108.860657
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
