Nam Kong 3

Download PDF data sheet
Photo coming soon

Particulars

Owner: Chaleun Sekong Energy Co Ltd (CSE)

Designer: Pöyry Energy Ltd.

Contractor: China Gezhouba Group Co.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 471 m3x106

Height: 65 metres

Length: 500 metres

Volume of RCC: 379 m3x103

Total volume: unknown

Construction Dates

Start of Project: 11/17 (November 2017)

Start of RCC: /18 ( 2018)

End of RCC: /19 ( 2019)

End of Project: 05/20 (May 2020)

Country: Laos

River: Nam Kong

DMS Co-ordinates: 14˚34'34"N, 106˚55'27"E

DD Co-ordinates: 14.576111, 106.924164