Nam Kong 3
Download PDF data sheet
Photo coming soon

Particulars
Owner: Chaleun Sekong Energy Co Ltd (CSE)
Designer: Pöyry Energy Ltd.
Contractor: China Gezhouba Group Co.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 471 m3x106
Height: 65 metres
Length: 500 metres
Volume of RCC: 379 m3x103
Total volume: unknown
Construction Dates
Start of Project: 11/17 (November 2017)
Start of RCC: —/18 (— 2018)
End of RCC: —/19 (— 2019)
End of Project: 05/20 (May 2020)
Country: Laos
River: Nam Kong
DMS Co-ordinates: 14˚34'34"N, 106˚55'27"E
DD Co-ordinates: 14.576111, 106.924164