SEARCHING
... please wait

Nam Kong 3

< Back to search results

Download PDF data sheet
Nam Kong 3 on Google Earth
Nam Kong 3 on Google Earth

Particulars

Owner: Chaleun Sekong Energy Co Ltd (CSE)

Designer: Pöyry Energy Ltd.

Contractor: CGGC (China Gezhouba Group Co.)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 471 m3x106

Height: 65 metres

Length: 500 metres

Volume of RCC: 347 m3x103

Total volume: 400 m3x103

Construction Dates

Start of Project: 11/17 (November 2017)

Start of RCC: 03/19 (March 2019)

End of RCC: 02/21 (February 2021)

End of Project: 11/21 (November 2021)

Country: Laos

River: Nam Kong

DMS Co-ordinates: 14˚34'21.27"N, 106˚55'9.09"E

DD Co-ordinates: 14.572575, 106.919189

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)