Particulars

Owner: Gilan Province Water Authority

Designer: Mahab Ghodss

Contractor: Jyane Construction Co.

Statistics

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

Reservoir capacity: 98 m3x106

Height: 137 metres

Length: 372 metres

Volume of RCC: 950 m3x103

Total volume: 1180 m3x103

Construction Dates

Start of Project: 03/12 (March 2012)

Start of RCC: 03/16 (March 2016)

End of RCC: /18 ( 2018)

End of Project: 03/19 (March 2019)

Country: Iran

River: Shafaroud

DMS Co-ordinates: 37˚31'45"N, 49˚06'7"E

DD Co-ordinates: 37.529167, 49.101944

Facings

Upstream

SlopeType
0.10RCC against formwork (GEVR/GE-RCC)
0.50 

Downstream

SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type