Song Giang 1
Download PDF data sheet
Song Giang 1 under construction

Particulars
Owner: Nexif Energy & Song Giang Hydropower Joint Stock Company
Designer: PECC3 (Power Engineering Consulting Company Nº3)
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation
Reservoir capacity: unknown
Height: 26 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/19 (— 2019)
Start of RCC: —/22 (— 2022)
End of RCC: —/24 (— 2024)
End of Project: —/25 (— 2025)
Country: Vietnam
River: Song Cái Nha Trong
DMS Co-ordinates: 12˚23'48.3"N, 108˚48'6.90"E
DD Co-ordinates: 12.39675, 108.801918
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
