Tuoba
Download PDF data sheet
Tuoba completed

Particulars
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Designer: Beijing Hydropower Investigation, Design and Research Institute
Contractor: 2nd Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1338 m3x106
Height: 158 metres
Length: 508 metres
Volume of RCC: unknown
Total volume: 3600 m3x103
Construction Dates
Start of Project: —/15 (— 2015)
Start of RCC: —/18 (— 2018)
End of RCC: —/22 (— 2022)
End of Project: —/24 (— 2024)
Country: China
River: Langcang (Mekong)
DMS Co-ordinates: 27˚11'37.96"N, 99˚06'27.16"E
DD Co-ordinates: 27.193878, 99.107544