SEARCHING
... please wait

Tuoba

< Back to search results

Download PDF data sheet
Tuoba completed
Tuoba completed

Particulars

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Designer: Beijing Hydropower Investigation, Design and Research Institute

Contractor: 2nd Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 1338 m3x106

Height: 158 metres

Length: 508 metres

Volume of RCC: unknown

Total volume: 3600 m3x103

Construction Dates

Start of Project: /15 ( 2015)

Start of RCC: /18 ( 2018)

End of RCC: /22 ( 2022)

End of Project: /24 ( 2024)

Country: China

River: Langcang (Mekong)

DMS Co-ordinates: 27˚11'37.96"N, 99˚06'27.16"E

DD Co-ordinates: 27.193878, 99.107544

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type