Serra dos Cavalinhos II
Download PDF data sheet
Serra dos Cavalinhos II completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 8 m3x106
Height: 42 metres
Length: 123 metres
Volume of RCC: 33 m3x103
Total volume: 80 m3x103
Construction Dates
Start of Project: —/11 (— 2011)
Start of RCC: —/12 (— 2012)
End of RCC: —/12 (— 2012)
End of Project: —/13 (— 2013)
Country: Brazil
River: das Antas
DMS Co-ordinates: 28˚47'30.71"S, 50˚44'46.68"W
DD Co-ordinates: -28.791864, -50.7463
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |
